Construction Europe - January-February 2020

Premium Content

30 January 2020

CE Jan-Feb 2020 1

Included in this issue: 

  • WHEELED LOADERS 
    These robust workhorses have been among the most popular machines on construction sites for many years, and latest models are more versatile, comfortable and environmentally friendly than ever, as Joe Sargent reports
  • ENGINES 
    Katherine Weir talks to engine manufacturers about the future of diesel power and gets their views on how electric and hybrid technologies are being received by construction industry professionals in Europe
  • ATTACHMENTS 
    Construction Europe editor Mike Hayes reports on the significant benefits that can potentially be achieved in both productivity and efficiency, by operators who are ready to embrace and make good use of the latest attachments and coupling systems
  • CONSTRUCTION TECHNOLOGY SUPPLEMENT
    NEWS Latest developments in tech products and processes
    TELEMATICS Jenny Lescohier on new construction ‘ecosystems’
    VR/AR Mike Hayes reports on the realities of 21st century projects
    3D PRINTING Andy Brown views a sector poised to break through
    INTERVIEW: Burcin Kaplanoglu of Oracle
    SURVEYING Joe Sargent reports on early adopters saving time and money by utilising the latest surveying technology

Supporting documents

Click links below to download and view individual files.

 
CE Jan-Feb 2020 Size: 27.0 MB Click to download
More News from Construction Europe
Aecom pairs with energy firms to pursue UK’s first nuclear fusion plant
Engineering company Aecom has announced a partnership with two energy companies to pursue the development of the first private-sector-led nuclear fusion power plant project in the UK
Three firms share US$1.29bn Hudson Tunnel section in New York
Three contractors – Skanska, Traylor Bros, Walsh Construction – have signed a contract for the construction of the Hudson Tunnel Package 1C in New York, USA.
Rethinking compact equipment for space-constrained job sites
On urban construction and beyond, should contractors be looking to smaller, more versatile machines to boost productivity?